Triple

T5639677
Position Surface form Disambiguated ID Type / Status
Subject Sher-e-Bangla Nagar E124234 entity
Predicate instanceOf P0 FINISHED
Object planned area C13404 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: planned area
Context triple: [Sher-e-Bangla Nagar, instanceOf, planned area]
  • A. community plan area
    A community plan area is a geographically defined section of a jurisdiction for which detailed land use, development, and infrastructure policies are established to guide local growth and community character.
  • B. planning district chosen
    A planning district is a defined geographic area used by governments or organizations to coordinate land use, infrastructure, and development policies.
  • C. land use planning area
    A land use planning area is a defined geographic region designated for coordinated management and regulation of land uses to achieve specific environmental, social, and economic development objectives.
  • D. planned city
    A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
  • E. planned residential community
    A planned residential community is a deliberately designed neighborhood or development where housing, infrastructure, amenities, and land use are pre-organized to create a cohesive living environment.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c00824643c81909ffdb888a2d35189 completed March 22, 2026, 3:17 p.m.
Created at: March 22, 2026, 3:41 p.m.