Triple
T5637414
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Mighty Canadian Minebuster |
E124180
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | wooden roller coaster |
C4764
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: wooden roller coaster Context triple: [Mighty Canadian Minebuster, instanceOf, wooden roller coaster]
-
A.
steel roller coaster
A steel roller coaster is a high-speed amusement ride featuring smooth, tubular steel tracks that enable complex inversions, steep drops, and precise, controlled maneuvers for riders.
-
B.
roller coaster
chosen
A roller coaster is an amusement ride consisting of a track with steep drops, sharp turns, and inversions that carries passengers in open cars for a thrilling, high-speed experience.
-
C.
launched roller coaster
A launched roller coaster is a type of roller coaster that uses propulsion systems such as linear motors, hydraulic launches, or compressed air to rapidly accelerate trains to high speeds without relying on a traditional lift hill.
-
D.
flying roller coaster
A flying roller coaster is a type of thrill ride where passengers are secured in a prone, face-down position beneath the track to simulate the sensation of free flight through the air.
-
E.
roller coaster variant
A roller coaster variant is a specific type or design of roller coaster that differs in track layout, ride mechanics, theming, or rider experience from standard models.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c00824643c81909ffdb888a2d35189 |
completed | March 22, 2026, 3:17 p.m. |
Created at: March 22, 2026, 3:41 p.m.