Triple
T5633431
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cría cuervos |
E147887
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Spanish drama film |
C18496
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Spanish drama film Context triple: [Cría cuervos, instanceOf, Spanish drama film]
-
A.
Spanish award
A Spanish award is an honor or distinction granted in Spain to recognize outstanding achievements or contributions in fields such as arts, sciences, sports, culture, or public service.
-
B.
mixed Italo-Spanish division
A mixed Italo-Spanish division is a combined military formation composed of both Italian and Spanish units, integrated under a unified command structure for joint operations.
-
C.
Spanish person
A Spanish person is an individual who is a citizen or national of Spain, typically sharing in its cultural, historical, and linguistic heritage.
-
D.
British drama film
A British drama film is a feature-length motion picture produced primarily in the United Kingdom that focuses on realistic, character-driven storytelling and emotional or social conflicts.
-
E.
ethnic cinema
Ethnic cinema is a category of film that focuses on the stories, experiences, and cultural expressions of specific ethnic groups, often highlighting issues of identity, migration, and social marginalization.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c00907bc8881909ed760d3ed73ef35 |
completed | March 22, 2026, 3:21 p.m. |
Created at: March 22, 2026, 3:41 p.m.