Triple

T5619223
Position Surface form Disambiguated ID Type / Status
Subject NRG Station E147556 entity
Predicate namingRightsSponsor P3318 FINISHED
Object NRG Energy E328168 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: NRG Energy | Statement: [NRG Station, namingRightsSponsor, NRG Energy]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: NRG Energy
Context triple: [NRG Station, namingRightsSponsor, NRG Energy]
  • A. NRG Energy chosen
    NRG Energy is a large American energy company that produces and sells electricity and related services to residential, commercial, and industrial customers.
  • B. Reliant Energy
    Reliant Energy is a U.S.-based retail electricity provider and energy company known for supplying power to residential and commercial customers, particularly in Texas.
  • C. Vistra Corp
    Vistra Corp is a large U.S. integrated retail electricity and power generation company.
  • D. Calpine Corporation
    Calpine Corporation is a major American power company specializing in natural gas-fired and geothermal electricity generation.
  • E. Cinergy Corporation
    Cinergy Corporation was a U.S.-based energy company best known in part for its naming rights sponsorship of Cincinnati’s Cinergy Field baseball stadium.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c00905d4588190bd967842bbcf2219 completed March 22, 2026, 3:21 p.m.
NER Named-entity recognition batch_69c021dd5d0081909d18d16596fac507 completed March 22, 2026, 5:07 p.m.
NED1 Entity disambiguation (via context triple) batch_69c0287fcde881908f761b701bf9a4f3 completed March 22, 2026, 5:36 p.m.
Created at: March 22, 2026, 3:40 p.m.