Triple
T5617719
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | T Third Street |
E147519
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | San Francisco Municipal Railway line |
C11774
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: San Francisco Municipal Railway line Context triple: [T Third Street, instanceOf, San Francisco Municipal Railway line]
-
A.
subway line
A subway line is a fixed route within an urban rail transit system, consisting of a sequence of stations and tracks over which trains operate according to a scheduled service.
-
B.
former Los Angeles Metro Rail line
A former Los Angeles Metro Rail line is a previously operated light rail or rapid transit route within the Los Angeles Metro Rail system that has since been discontinued, restructured, or replaced.
-
C.
tram line
chosen
A tram line is a designated route, typically with fixed tracks and stops, along which trams operate to provide urban or suburban public transportation.
-
D.
monorail line
A monorail line is a guided transit route where trains run on a single rail or beam, typically elevated, providing efficient and often automated urban or interurban transportation.
-
E.
monorail transit line
A monorail transit line is an elevated or ground-level guided transportation system in which trains run on a single rail, typically used for urban or campus passenger service.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c00905d4588190bd967842bbcf2219 |
completed | March 22, 2026, 3:21 p.m. |
Created at: March 22, 2026, 3:40 p.m.