Triple

T5604975
Position Surface form Disambiguated ID Type / Status
Subject Strategic Transport Projects Review E147211 entity
Predicate instanceOf P0 FINISHED
Object infrastructure investment plan C10251 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: infrastructure investment plan
Context triple: [Strategic Transport Projects Review, instanceOf, infrastructure investment plan]
  • A. infrastructure project
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • B. infrastructure
    Infrastructure is the foundational physical and organizational systems—such as transportation, utilities, communication networks, and public facilities—that enable a society or organization to function and grow.
  • C. aviation infrastructure plan
    An aviation infrastructure plan is a strategic blueprint that outlines the development, expansion, maintenance, and integration of airport facilities, airspace systems, and supporting services to safely and efficiently meet current and future air transportation needs.
  • D. transport infrastructure agreement
    A transport infrastructure agreement is a formal contract between parties that defines the responsibilities, funding, timelines, and performance standards for planning, building, operating, or maintaining transportation facilities such as roads, railways, ports, or airports.
  • E. regional transport plan chosen
    A regional transport plan is a strategic framework that outlines long-term goals, policies, and coordinated investments for transportation systems across a defined geographic region.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0090500f881908374285baf0ac46f completed March 22, 2026, 3:21 p.m.
Created at: March 22, 2026, 3:39 p.m.