Triple
T5603979
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Integrated Freight & Logistics |
E147187
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | freight transport sector |
C19341
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: freight transport sector Context triple: [Integrated Freight & Logistics, instanceOf, freight transport sector]
-
A.
freight railroad
A freight railroad is a rail transport system dedicated to moving goods and commodities—such as raw materials, manufactured products, and containers—using freight trains over a network of tracks.
-
B.
freight rail corridor
A freight rail corridor is a designated railway route primarily used for the efficient, high-capacity movement of goods and cargo between industrial, commercial, and logistics hubs.
-
C.
freight railroad network
A freight railroad network is an interconnected system of rail lines, terminals, and supporting infrastructure designed to transport goods and raw materials efficiently between industrial, commercial, and logistical hubs.
-
D.
freight railroad company
A freight railroad company is an organization that owns or operates rail infrastructure and rolling stock to transport goods and commodities by train between industrial, commercial, and logistics locations.
-
E.
air cargo industry infrastructure
The air cargo industry infrastructure comprises the integrated network of airports, cargo terminals, aircraft, ground handling systems, logistics hubs, and digital platforms that enable the efficient, secure, and timely movement of goods by air.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c0090500f881908374285baf0ac46f |
completed | March 22, 2026, 3:21 p.m. |
Created at: March 22, 2026, 3:39 p.m.