Triple
T5603978
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Integrated Freight & Logistics |
E147187
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | logistics sector |
C13859
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: logistics sector Context triple: [Integrated Freight & Logistics, instanceOf, logistics sector]
-
A.
logistical operation
A logistical operation is a coordinated set of activities and processes that plan, implement, and control the efficient movement and storage of goods, information, or resources from origin to destination.
-
B.
logistics command
Logistics command is the organizational function responsible for planning, coordinating, and controlling the movement, supply, and maintenance of resources to ensure operational readiness and sustained support.
-
C.
shipping service
A shipping service is a business or system that transports goods from one location to another, managing logistics such as packaging, routing, tracking, and delivery.
-
D.
air cargo industry infrastructure
The air cargo industry infrastructure comprises the integrated network of airports, cargo terminals, aircraft, ground handling systems, logistics hubs, and digital platforms that enable the efficient, secure, and timely movement of goods by air.
-
E.
economic sector
chosen
An economic sector is a broad category of economic activity that groups industries and businesses based on the type of goods or services they produce or the stage of production they represent.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c0090500f881908374285baf0ac46f |
completed | March 22, 2026, 3:21 p.m. |
Created at: March 22, 2026, 3:39 p.m.