Triple
T5569628
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Amawalk Dam |
E145965
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | water supply dam |
C19250
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: water supply dam Context triple: [Amawalk Dam, instanceOf, water supply dam]
-
A.
reservoir dam
A reservoir dam is a large engineered barrier built across a watercourse to store and regulate water in an upstream reservoir for purposes such as water supply, flood control, irrigation, and power generation.
-
B.
irrigation dam
An irrigation dam is a barrier constructed across a watercourse to store and regulate water specifically for agricultural use, enabling controlled distribution to fields and crops.
-
C.
hydroelectric dam
A hydroelectric dam is a large engineered structure that stores and controls river water to drive turbines and generate electricity while managing water flow and levels.
-
D.
water reservoir complex
A water reservoir complex is an integrated system of interconnected reservoirs, infrastructure, and control facilities designed to store, manage, and distribute water for purposes such as supply, irrigation, flood control, and power generation.
-
E.
multipurpose dam
A multipurpose dam is a large engineered barrier built across a river or stream to store and regulate water for multiple uses such as irrigation, hydropower generation, flood control, water supply, and recreation.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c008fdae24819081aa002ad99cd966 |
completed | March 22, 2026, 3:21 p.m. |
Created at: March 22, 2026, 3:36 p.m.