Triple

T5569628
Position Surface form Disambiguated ID Type / Status
Subject Amawalk Dam E145965 entity
Predicate instanceOf P0 FINISHED
Object water supply dam C19250 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: water supply dam
Context triple: [Amawalk Dam, instanceOf, water supply dam]
  • A. reservoir dam
    A reservoir dam is a large engineered barrier built across a watercourse to store and regulate water in an upstream reservoir for purposes such as water supply, flood control, irrigation, and power generation.
  • B. irrigation dam
    An irrigation dam is a barrier constructed across a watercourse to store and regulate water specifically for agricultural use, enabling controlled distribution to fields and crops.
  • C. hydroelectric dam
    A hydroelectric dam is a large engineered structure that stores and controls river water to drive turbines and generate electricity while managing water flow and levels.
  • D. water reservoir complex
    A water reservoir complex is an integrated system of interconnected reservoirs, infrastructure, and control facilities designed to store, manage, and distribute water for purposes such as supply, irrigation, flood control, and power generation.
  • E. multipurpose dam
    A multipurpose dam is a large engineered barrier built across a river or stream to store and regulate water for multiple uses such as irrigation, hydropower generation, flood control, water supply, and recreation.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008fdae24819081aa002ad99cd966 completed March 22, 2026, 3:21 p.m.
Created at: March 22, 2026, 3:36 p.m.