Triple
T5561484
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | APL New Horizons bus |
E145775
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | spacecraft bus |
C2826
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: spacecraft bus Context triple: [APL New Horizons bus, instanceOf, spacecraft bus]
-
A.
spacecraft
chosen
A spacecraft is a vehicle or device designed to travel beyond Earth's atmosphere for purposes such as exploration, communication, research, or transportation.
-
B.
spacecraft onboard computer
A spacecraft onboard computer is a specialized, radiation-hardened computing system that autonomously manages spacecraft functions, navigation, communication, and data handling in the harsh environment of space.
-
C.
spacecraft power system
A spacecraft power system is the integrated set of components and subsystems that generate, store, condition, and distribute electrical energy to support all spacecraft functions throughout its mission.
-
D.
attitude control computer
An attitude control computer is an onboard system that calculates and commands the necessary control actions to orient and stabilize a vehicle, such as a spacecraft or aircraft, in three-dimensional space.
-
E.
space station resupply vehicle
A space station resupply vehicle is a spacecraft designed to transport cargo, equipment, and sometimes crew to and from an orbiting space station, supporting its ongoing operations and maintenance.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c008fcaf788190bafa02a1917ee73b |
completed | March 22, 2026, 3:21 p.m. |
Created at: March 22, 2026, 3:36 p.m.