Triple

T5553732
Position Surface form Disambiguated ID Type / Status
Subject Consolidated Rail Corporation E145586 entity
Predicate privatizationMethod P65337 FINISHED
Object initial public offering LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: initial public offering | Statement: [Consolidated Rail Corporation, privatizationMethod, initial public offering]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: privatizationMethod
Context triple: [Consolidated Rail Corporation, privatizationMethod, initial public offering]
  • A. privatizedOn
    Indicates the date or point in time when an entity transitioned from public or state ownership/control to private ownership/control.
  • B. privatisationContext
    Indicates the context, conditions, or circumstances under which a privatisation process or action takes place.
  • C. mobilizationMethod
    Indicates the method or process by which resources, people, or assets are organized and activated for a particular purpose or operation.
  • D. procurementMethod
    Indicates the specific process or approach used to acquire goods, services, or works (e.g., open tender, direct purchase, negotiated procedure).
  • E. modernizationPolicy
    Indicates the implementation or presence of policies aimed at updating, reforming, or advancing existing systems, structures, or practices.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008fcaf788190bafa02a1917ee73b completed March 22, 2026, 3:21 p.m.
NER Named-entity recognition batch_69c01ff9c9c48190b5e587d58c6515d8 completed March 22, 2026, 4:59 p.m.
PD Predicate disambiguation batch_69c01b10bbf8819098655839c03b7832 completed March 22, 2026, 4:38 p.m.
PDg Predicate description generation batch_69c01f051e508190b3886d87b4afdd0b completed March 22, 2026, 4:55 p.m.
Created at: March 22, 2026, 3:36 p.m.