Triple

T5543129
Position Surface form Disambiguated ID Type / Status
Subject Article 17: Schedule E145340 entity
Predicate instanceOf P0 FINISHED
Object implementing provision C5927 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: implementing provision
Context triple: [Article 17: Schedule, instanceOf, implementing provision]
  • A. provisional state
    A provisional state is a temporary and often unstable condition or arrangement maintained until a more permanent or definitive state is established.
  • B. implementing body of EU programme
    An implementing body of an EU programme is an organization designated to manage, execute, and oversee specific EU-funded activities in accordance with EU rules, objectives, and reporting requirements.
  • C. safeguard measure provision chosen
    A safeguard measure provision is a legal clause that allows temporary restrictions or corrective actions to protect a party’s interests when unexpected or harmful circumstances arise under an agreement or regulatory framework.
  • D. execution
    Execution is the process by which a planned set of actions or instructions is carried out to achieve a specific outcome or fulfill a defined intent.
  • E. standards implementation initiative
    A standards implementation initiative is a coordinated effort to adopt, operationalize, and enforce agreed-upon standards across an organization or ecosystem to ensure consistency, interoperability, and quality.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008fa64888190adae56c8f9ea4031 completed March 22, 2026, 3:21 p.m.
Created at: March 22, 2026, 3:35 p.m.