Triple

T5517827
Position Surface form Disambiguated ID Type / Status
Subject Tietê River E144727 entity
Predicate hasDam P8736 FINISHED
Object Nova Avanhandava Dam E542769 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Nova Avanhandava Dam | Statement: [Tietê River, hasDam, Nova Avanhandava Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Nova Avanhandava Dam
Context triple: [Tietê River, hasDam, Nova Avanhandava Dam]
  • A. Manantali Dam
    Manantali Dam is a large multi-purpose dam in Mali that plays a key role in hydroelectric power generation, irrigation, and flood control for the Senegal River basin.
  • B. Bariri Dam chosen
    Bariri Dam is a hydroelectric and river regulation structure located on Brazil’s Tietê River, contributing to regional power generation and water management.
  • C. Betania Dam
    Betania Dam is a major hydroelectric dam and reservoir in Colombia, known for generating power and supporting irrigation and aquaculture in the Huila region.
  • D. Zhinvali Dam
    Zhinvali Dam is a large hydroelectric dam and reservoir in eastern Georgia, known for its striking turquoise waters and role in supplying water and power to the region.
  • E. Almatti Dam
    Almatti Dam is a major hydroelectric and irrigation dam in Karnataka, India, built across the Krishna River as part of the Upper Krishna Project.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008f77ff88190b0cd50ca207295d1 completed March 22, 2026, 3:21 p.m.
NER Named-entity recognition batch_69c01f6cefe48190bfda90d6afab8468 completed March 22, 2026, 4:57 p.m.
NED1 Entity disambiguation (via context triple) batch_69c0a1308a548190b49a8212c3f3f7f0 completed March 23, 2026, 2:10 a.m.
Created at: March 22, 2026, 3:33 p.m.