Triple

T5506402
Position Surface form Disambiguated ID Type / Status
Subject Puerto Rico Energy Bureau E144450 entity
Predicate regulatesEntity P14466 FINISHED
Object Puerto Rico Electric Power Authority E26375 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Puerto Rico Electric Power Authority | Statement: [Puerto Rico Energy Bureau, regulatesEntity, Puerto Rico Electric Power Authority]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Puerto Rico Electric Power Authority
Context triple: [Puerto Rico Energy Bureau, regulatesEntity, Puerto Rico Electric Power Authority]
  • A. Puerto Rico Electric Power Authority chosen
    The Puerto Rico Electric Power Authority is the public corporation responsible for generating, transmitting, and distributing electricity across Puerto Rico.
  • B. Puerto Rico Electric Power Authority Revitalization Corporation
    Puerto Rico Electric Power Authority Revitalization Corporation is a special-purpose entity created to support the financial restructuring and modernization efforts of Puerto Rico’s public electric utility system.
  • C. Puerto Rico Energy Bureau
    The Puerto Rico Energy Bureau is the independent government regulatory body responsible for overseeing and regulating Puerto Rico’s energy sector, including electricity rates, planning, and utility performance.
  • D. Guam Power Authority
    Guam Power Authority is the government-owned electric utility responsible for generating, transmitting, and distributing electricity throughout Guam.
  • E. New York Power Authority
    The New York Power Authority is a New York State public power organization that generates and transmits electricity and manages key infrastructure assets across the state.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: regulatesEntity
Context triple: [Puerto Rico Energy Bureau, regulatesEntity, Puerto Rico Electric Power Authority]
  • A. regulatesIn
    Indicates that one entity controls, modulates, or influences the activity, expression, or behavior of another entity within a system or process.
  • B. regulatesOrIsRegulatedBy
    Indicates a bidirectional regulatory relationship in which one entity controls, influences, or modulates another, or is itself controlled, influenced, or modulated by that other entity.
  • C. alsoRegulates
    Indicates that an entity not only has a primary regulatory effect on a target but additionally regulates that same target through another, supplementary regulatory relationship.
  • D. regulatesWith chosen
    Indicates that one entity controls, modulates, or influences the activity, state, or behavior of another entity through some regulatory mechanism or interaction.
  • E. regulatesThrough
    Indicates that one entity exerts control or influence over another by means of an intermediate mechanism, pathway, or process.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008f6b5048190a09064116062cf69 completed March 22, 2026, 3:21 p.m.
NER Named-entity recognition batch_69c01f47d2dc8190ad874be6902d8a4c completed March 22, 2026, 4:56 p.m.
NED1 Entity disambiguation (via context triple) batch_69c027b7ef2481908b43f34721b8a8b3 completed March 22, 2026, 5:32 p.m.
PD Predicate disambiguation batch_69c01b07bde08190b3933b96bdc70dd5 completed March 22, 2026, 4:38 p.m.
Created at: March 22, 2026, 3:32 p.m.