Triple
T5502128
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Modernisation Plan of the 1950s |
E144352
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | British Railways policy document |
C19106
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: British Railways policy document Context triple: [Modernisation Plan of the 1950s, instanceOf, British Railways policy document]
-
A.
region of British Railways
A region of British Railways is a large administrative and operational division of the national rail network, responsible for managing railway services, infrastructure, and staff within a defined geographic area of Great Britain.
-
B.
British government policy statement
A British government policy statement is an official, authoritative document or announcement that sets out the UK government’s intentions, principles, and planned actions on a specific public issue or area of governance.
-
C.
railway locomotive standardization scheme
A railway locomotive standardization scheme is a systematic framework for defining, organizing, and unifying the design, classification, and specifications of locomotives across a rail network to ensure compatibility, efficiency, and ease of maintenance.
-
D.
railway industry body
A railway industry body is an organization that represents, coordinates, and sets standards or policies for companies and stakeholders involved in the rail transport sector.
-
E.
UK government-commissioned review
A UK government-commissioned review is an official, time-bound investigation or study, requested by the government and typically led by an independent expert, to examine a specific policy issue and provide evidence-based recommendations.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c008f5a2748190bce7a39aabf87a6d |
completed | March 22, 2026, 3:21 p.m. |
Created at: March 22, 2026, 3:32 p.m.