Triple

T5502128
Position Surface form Disambiguated ID Type / Status
Subject Modernisation Plan of the 1950s E144352 entity
Predicate instanceOf P0 FINISHED
Object British Railways policy document C19106 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: British Railways policy document
Context triple: [Modernisation Plan of the 1950s, instanceOf, British Railways policy document]
  • A. region of British Railways
    A region of British Railways is a large administrative and operational division of the national rail network, responsible for managing railway services, infrastructure, and staff within a defined geographic area of Great Britain.
  • B. British government policy statement
    A British government policy statement is an official, authoritative document or announcement that sets out the UK government’s intentions, principles, and planned actions on a specific public issue or area of governance.
  • C. railway locomotive standardization scheme
    A railway locomotive standardization scheme is a systematic framework for defining, organizing, and unifying the design, classification, and specifications of locomotives across a rail network to ensure compatibility, efficiency, and ease of maintenance.
  • D. railway industry body
    A railway industry body is an organization that represents, coordinates, and sets standards or policies for companies and stakeholders involved in the rail transport sector.
  • E. UK government-commissioned review
    A UK government-commissioned review is an official, time-bound investigation or study, requested by the government and typically led by an independent expert, to examine a specific policy issue and provide evidence-based recommendations.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008f5a2748190bce7a39aabf87a6d completed March 22, 2026, 3:21 p.m.
Created at: March 22, 2026, 3:32 p.m.