Triple
T5502027
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Freight Operating Companies |
E144350
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | rail transport operator category |
C9409
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: rail transport operator category Context triple: [Freight Operating Companies, instanceOf, rail transport operator category]
-
A.
transport infrastructure operator
A transport infrastructure operator is an entity responsible for managing, maintaining, and regulating transportation networks and facilities such as roads, railways, ports, or airports to ensure safe and efficient movement of people and goods.
-
B.
rail transport company
chosen
A rail transport company is an organization that owns, operates, or manages trains and railway infrastructure to provide freight and/or passenger transportation services.
-
C.
mass transit operator
A mass transit operator is an entity responsible for managing, coordinating, and providing public transportation services such as buses, trains, or subways within a specific region or network.
-
D.
private railway company
A private railway company is a non-governmental business entity that owns, operates, or manages rail transport services for passengers and/or freight, typically for profit under regulatory oversight.
-
E.
public railway
A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c008f5a2748190bce7a39aabf87a6d |
completed | March 22, 2026, 3:21 p.m. |
Created at: March 22, 2026, 3:32 p.m.