Triple

T5498565
Position Surface form Disambiguated ID Type / Status
Subject suburban Cook County E144269 entity
Predicate hasMajorHighway P385 FINISHED
Object Interstate 355 E393863 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 355 | Statement: [suburban Cook County, hasMajorHighway, Interstate 355]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 355
Context triple: [suburban Cook County, hasMajorHighway, Interstate 355]
  • A. Interstate 355 chosen
    Interstate 355 is a toll highway in the Chicago metropolitan area that serves as a suburban north–south bypass around the city.
  • B. Interstate 35E
    Interstate 35E is the eastern branch of Interstate 35 that runs through Dallas, Texas, serving as a key north–south transportation corridor in the region.
  • C. Interstate 35E
    Interstate 35E is a major north–south U.S. Interstate Highway that runs through Saint Paul, Minnesota, as part of the split of Interstate 35 in the Twin Cities metropolitan area.
  • D. Interstate 35
    Interstate 35 is a major north–south U.S. highway running from the Mexican border in Texas through the central United States to Minnesota, serving numerous key cities along its route.
  • E. Interstate 55
    Interstate 55 is a major north–south U.S. highway running from Louisiana to Illinois, connecting cities such as New Orleans, Memphis, and Chicago.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008f5a2748190bce7a39aabf87a6d completed March 22, 2026, 3:21 p.m.
NER Named-entity recognition batch_69c01b9050d08190b0cfcfdb5d414476 completed March 22, 2026, 4:40 p.m.
NED1 Entity disambiguation (via context triple) batch_69c9952ebfec819096a393b1231a1703 completed March 29, 2026, 9:10 p.m.
Created at: March 22, 2026, 3:32 p.m.