Triple

T5484608
Position Surface form Disambiguated ID Type / Status
Subject Ministry of Defence radar installation on Hirta E123548 entity
Predicate instanceOf P0 FINISHED
Object surveillance facility C13910 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: surveillance facility
Context triple: [Ministry of Defence radar installation on Hirta, instanceOf, surveillance facility]
  • A. intelligence agency facility
    An intelligence agency facility is a secure, specialized complex where classified information is collected, analyzed, stored, and operations are coordinated to support national security and intelligence objectives.
  • B. secure facility
    A secure facility is a controlled-access location designed with physical, technical, and procedural safeguards to protect people, assets, and sensitive information from unauthorized access or harm.
  • C. signals intelligence facility chosen
    A signals intelligence facility is a secure installation equipped with specialized systems and personnel dedicated to intercepting, processing, analyzing, and disseminating electronic communications and emissions for intelligence and security purposes.
  • D. infrared surveillance system
    An infrared surveillance system is a security solution that uses infrared sensors and cameras to detect, monitor, and record heat signatures in low-light or no-light environments for continuous observation and threat detection.
  • E. detention facility
    A detention facility is a secure institution designed to confine individuals who are awaiting trial, sentencing, or serving a criminal sentence under legal authority.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd4648883481909e9775d43300c5fa completed March 20, 2026, 1:06 p.m.
Created at: March 20, 2026, 2:10 p.m.