Triple
T5481285
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 3GPP TS 24-series |
E123471
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | technical specification series |
C4095
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: technical specification series Context triple: [3GPP TS 24-series, instanceOf, technical specification series]
-
A.
Technical specification
chosen
A technical specification is a detailed, formal document that precisely defines the functional, performance, and interface requirements of a system, component, or product to guide its design, implementation, and verification.
-
B.
technology specification process
The technology specification process is the structured sequence of activities through which requirements are gathered, analyzed, and documented to define the technical standards, features, and constraints of a technology solution.
-
C.
technical standard component
A technical standard component is a defined, reusable element or module that conforms to established specifications to ensure compatibility, interoperability, and consistent performance within a larger system or standard.
-
D.
W3C technical specification
A W3C technical specification is a formal, consensus-based document published by the World Wide Web Consortium that defines standards, protocols, and guidelines to ensure the interoperability and evolution of the World Wide Web.
-
E.
power delivery specification
A power delivery specification defines the technical requirements, limits, and conditions under which electrical power must be supplied, distributed, and regulated within a system or between interconnected systems.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd4648883481909e9775d43300c5fa |
completed | March 20, 2026, 1:06 p.m. |
Created at: March 20, 2026, 2:09 p.m.