Triple

T5468399
Position Surface form Disambiguated ID Type / Status
Subject Mill City E122769 entity
Predicate associatedWithHistoricDistrict P51598 FINISHED
Object Lowell National Historical Park E118860 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Lowell National Historical Park | Statement: [Mill City, associatedWithHistoricDistrict, Lowell National Historical Park]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Lowell National Historical Park
Context triple: [Mill City, associatedWithHistoricDistrict, Lowell National Historical Park]
  • A. Lowell National Historical Park chosen
    Lowell National Historical Park is a U.S. national historical park that preserves and interprets the 19th-century textile mills, canals, and industrial heritage of Lowell, Massachusetts.
  • B. Boston National Historical Park
    Boston National Historical Park is a collection of historically significant sites in Boston, Massachusetts, that commemorate key events and locations from the American Revolution and early United States history.
  • C. Minute Man National Historical Park
    Minute Man National Historical Park is a U.S. National Historical Park in Massachusetts that preserves key sites and battlefields from the opening engagements of the American Revolutionary War, including parts of the Battle Road between Lexington and Concord.
  • D. Adams National Historical Park
    Adams National Historical Park is a preserved historic site in Quincy, Massachusetts, encompassing the homes and legacy of U.S. Presidents John Adams and John Quincy Adams and their family.
  • E. Plimoth Patuxet Museums
    Plimoth Patuxet Museums is a living history museum in Plymouth, Massachusetts that recreates the 17th-century English Pilgrim settlement and Wampanoag homeland.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: associatedWithHistoricDistrict
Context triple: [Mill City, associatedWithHistoricDistrict, Lowell National Historical Park]
  • A. hasHistoricDistrictAssociation chosen
    Indicates a relationship in which an entity is associated with, linked to, or part of a designated historic district.
  • B. hasHistoricDistrict
    Indicates that an entity possesses or contains a designated historic district within its boundaries or domain.
  • C. residenceHistoric
    Indicates that a residence has historical significance or is formally recognized as a historic dwelling.
  • D. isHistoricPlace
    Indicates that a place holds recognized historical significance, often due to its age, events, or cultural importance.
  • E. isHistoricQuadrangleOf
    Indicates that one entity is a historically significant quadrangle (a four-sided courtyard or enclosed area) that belongs to, or is a defining part of, another entity such as a campus, complex, or site.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd4643f16081908d7f29e08096115a completed March 20, 2026, 1:06 p.m.
NER Named-entity recognition batch_69bd927c946c8190aef40679199fede3 completed March 20, 2026, 6:31 p.m.
NED1 Entity disambiguation (via context triple) batch_69bf48903dc48190b4e5a0c22545d6cc completed March 22, 2026, 1:40 a.m.
PD Predicate disambiguation batch_69bd91a370a88190b5d17b8a5387138d completed March 20, 2026, 6:27 p.m.
Created at: March 20, 2026, 2:09 p.m.