Triple

T5465689
Position Surface form Disambiguated ID Type / Status
Subject Napa River E122702 entity
Predicate subjectOf P38 FINISHED
Object Napa River Flood Protection Project
The Napa River Flood Protection Project is a comprehensive civil works initiative in Napa, California, designed to reduce flooding risks while restoring river habitats and integrating recreational and environmental enhancements into the riverfront.
E523213 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Napa River Flood Protection Project | Statement: [Napa River, subjectOf, Napa River Flood Protection Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Napa River Flood Protection Project
Context triple: [Napa River, subjectOf, Napa River Flood Protection Project]
  • A. Sacramento River watershed infrastructure
    Sacramento River watershed infrastructure comprises the network of dams, reservoirs, levees, canals, and related facilities that manage water supply, flood control, and ecosystem conditions throughout the Sacramento River basin in Northern California.
  • B. Feather River Project
    The Feather River Project is a major California water development and hydroelectric initiative centered on the Feather River watershed, providing water storage, power generation, and flood control for the state.
  • C. Truckee-Carson Project
    The Truckee-Carson Project is a major U.S. federal water management and irrigation initiative in western Nevada that diverts and distributes water from the Truckee and Carson rivers to support agriculture and regional development.
  • D. Central Valley Project
    The Central Valley Project is a large-scale federal water management system in California that stores and delivers water for agriculture, cities, and environmental uses across the Central Valley.
  • E. San Joaquin River Restoration Program
    The San Joaquin River Restoration Program is a long-term environmental initiative aimed at restoring flows, fish populations, and ecosystem health to California’s San Joaquin River while maintaining water supply reliability for agriculture and communities.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Napa River Flood Protection Project
Triple: [Napa River, subjectOf, Napa River Flood Protection Project]
Generated description
The Napa River Flood Protection Project is a comprehensive civil works initiative in Napa, California, designed to reduce flooding risks while restoring river habitats and integrating recreational and environmental enhancements into the riverfront.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Napa River Flood Protection Project
Target entity description: The Napa River Flood Protection Project is a comprehensive civil works initiative in Napa, California, designed to reduce flooding risks while restoring river habitats and integrating recreational and environmental enhancements into the riverfront.
  • A. Sacramento River watershed infrastructure
    Sacramento River watershed infrastructure comprises the network of dams, reservoirs, levees, canals, and related facilities that manage water supply, flood control, and ecosystem conditions throughout the Sacramento River basin in Northern California.
  • B. Feather River Project
    The Feather River Project is a major California water development and hydroelectric initiative centered on the Feather River watershed, providing water storage, power generation, and flood control for the state.
  • C. Truckee-Carson Project
    The Truckee-Carson Project is a major U.S. federal water management and irrigation initiative in western Nevada that diverts and distributes water from the Truckee and Carson rivers to support agriculture and regional development.
  • D. Central Valley Project
    The Central Valley Project is a large-scale federal water management system in California that stores and delivers water for agriculture, cities, and environmental uses across the Central Valley.
  • E. San Joaquin River Restoration Program
    The San Joaquin River Restoration Program is a long-term environmental initiative aimed at restoring flows, fish populations, and ecosystem health to California’s San Joaquin River while maintaining water supply reliability for agriculture and communities.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd4643f16081908d7f29e08096115a completed March 20, 2026, 1:06 p.m.
NER Named-entity recognition batch_69bd920590b481909b92091678ff1414 completed March 20, 2026, 6:29 p.m.
NED1 Entity disambiguation (via context triple) batch_69bf488b64d081908163edfff6484f5c completed March 22, 2026, 1:40 a.m.
NEDg Description generation batch_69bf49ed2e2081908642f700d97943e9 completed March 22, 2026, 1:46 a.m.
NED2 Entity disambiguation (via description) batch_69bf4abbf2488190a30dd222d0de0470 completed March 22, 2026, 1:49 a.m.
Created at: March 20, 2026, 2:08 p.m.