Triple

T5453383
Position Surface form Disambiguated ID Type / Status
Subject British Rail Class 180 E122420 entity
Predicate hasCouplingType P21783 FINISHED
Object Scharfenberg-type automatic coupler E440189 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Scharfenberg-type automatic coupler | Statement: [British Rail Class 180, hasCouplingType, Scharfenberg-type automatic coupler]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Scharfenberg-type automatic coupler
Context triple: [British Rail Class 180, hasCouplingType, Scharfenberg-type automatic coupler]
  • A. Scharfenberg coupler chosen
    The Scharfenberg coupler is an automatic railway coupling system widely used on modern passenger trains to quickly connect and disconnect cars while integrating mechanical, pneumatic, and electrical links.
  • B. Dellner automatic couplers
    Dellner automatic couplers are railway vehicle coupling systems designed to automatically connect and disconnect train units, commonly used on modern multiple-unit fleets such as the Bombardier Voyager family.
  • C. Janney coupler
    The Janney coupler is a widely used automatic railway coupling system designed to securely connect train cars while improving safety and ease of operation compared to earlier link-and-pin couplers.
  • D. Fell centre rail system
    The Fell centre rail system is a historic railway technology that uses an additional central rail and special gripping wheels to provide extra traction and braking on steep gradients.
  • E. Westinghouse air brake system
    The Westinghouse air brake system is a pioneering railway braking technology that greatly improved the safety and control of trains by using compressed air to apply brakes simultaneously across all cars.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasCouplingType
Context triple: [British Rail Class 180, hasCouplingType, Scharfenberg-type automatic coupler]
  • A. hasCoupling
    Indicates that two entities are linked or joined together in a way that allows them to interact, transfer, or coordinate motion, energy, or information.
  • B. hasCouplingConstant
    Indicates that one entity is associated with a specific coupling constant value that quantifies the strength of an interaction or relationship.
  • C. hasCouplers chosen
    Indicates that one entity is equipped with or possesses couplers that enable it to connect or link to another entity.
  • D. hasBondType
    Indicates the specific kind of bond or connection that exists between two related entities.
  • E. couplingCapability
    Indicates the ability or suitability of one entity to connect, link, or interface with another in a functional or compatible manner.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd46424248819085282ddf50a565f3 completed March 20, 2026, 1:06 p.m.
NER Named-entity recognition batch_69bd95be329c81908783420cf81b6af5 completed March 20, 2026, 6:45 p.m.
NED1 Entity disambiguation (via context triple) batch_69bf4140248081908c7f42b91579a837 completed March 22, 2026, 1:09 a.m.
PD Predicate disambiguation batch_69bd919e8d18819098c4af6a015e5cc2 completed March 20, 2026, 6:27 p.m.
Created at: March 20, 2026, 2:08 p.m.