Triple

T5418383
Position Surface form Disambiguated ID Type / Status
Subject LAX terminal complex E121186 entity
Predicate hasComponent P35 FINISHED
Object Terminal 0 (planned or under development)
Terminal 0 (planned or under development) is a future passenger terminal project at Los Angeles International Airport intended to expand capacity and modernize the airport’s facilities.
E518388 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Terminal 0 (planned or under development) | Statement: [LAX terminal complex, hasComponent, Terminal 0 (planned or under development)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Terminal 0 (planned or under development)
Context triple: [LAX terminal complex, hasComponent, Terminal 0 (planned or under development)]
  • A. Terminal 1
    Terminal 1 is the main passenger terminal at Geneva Airport, handling the majority of the airport’s commercial flights and services.
  • B. Terminal 1
    Terminal 1 is the larger and older of the two main passenger terminals at Mexico City International Airport, handling a significant share of the airport’s domestic and international flights.
  • C. Terminal 1
    Terminal 1 is the main passenger terminal at Lisbon’s Humberto Delgado Airport, handling the majority of the airport’s flights and services.
  • D. Terminal 1
    Terminal 1 is the main passenger terminal at Lanzarote Airport, handling the majority of the island’s commercial flights and traveler services.
  • E. Terminal 1
    Terminal 1 is the main passenger terminal at Berlin Brandenburg Airport, handling the majority of the airport’s check-in, security, and boarding operations.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Terminal 0 (planned or under development)
Triple: [LAX terminal complex, hasComponent, Terminal 0 (planned or under development)]
Generated description
Terminal 0 (planned or under development) is a future passenger terminal project at Los Angeles International Airport intended to expand capacity and modernize the airport’s facilities.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Terminal 0 (planned or under development)
Target entity description: Terminal 0 (planned or under development) is a future passenger terminal project at Los Angeles International Airport intended to expand capacity and modernize the airport’s facilities.
  • A. Terminal 1
    Terminal 1 is the main passenger terminal at Geneva Airport, handling the majority of the airport’s commercial flights and services.
  • B. Terminal 1
    Terminal 1 is the larger and older of the two main passenger terminals at Mexico City International Airport, handling a significant share of the airport’s domestic and international flights.
  • C. Terminal 1
    Terminal 1 is the main passenger terminal at Lisbon’s Humberto Delgado Airport, handling the majority of the airport’s flights and services.
  • D. Terminal 1
    Terminal 1 is the main passenger terminal at Lanzarote Airport, handling the majority of the island’s commercial flights and traveler services.
  • E. Terminal 1
    Terminal 1 is the main passenger terminal at Berlin Brandenburg Airport, handling the majority of the airport’s check-in, security, and boarding operations.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd463b58d88190b258261573de9e91 completed March 20, 2026, 1:06 p.m.
NER Named-entity recognition batch_69bd87e7ae388190b26d16d42e717023 completed March 20, 2026, 5:46 p.m.
NED1 Entity disambiguation (via context triple) batch_69bf3aadfa4c81908b57af80f534b121 completed March 22, 2026, 12:41 a.m.
NEDg Description generation batch_69bf3b7f947c8190bc15d839488f393b completed March 22, 2026, 12:44 a.m.
NED2 Entity disambiguation (via description) batch_69bf3bfde6148190a2e7aa76bd5dce37 completed March 22, 2026, 12:46 a.m.
Created at: March 20, 2026, 2:05 p.m.