Triple

T5403077
Position Surface form Disambiguated ID Type / Status
Subject Key Stage 2 national curriculum tests E120825 entity
Predicate assessmentStage P9657 FINISHED
Object end-of-key-stage assessment LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: end-of-key-stage assessment | Statement: [Key Stage 2 national curriculum tests, assessmentStage, end-of-key-stage assessment]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: assessmentStage
Context triple: [Key Stage 2 national curriculum tests, assessmentStage, end-of-key-stage assessment]
  • A. stageOf chosen
    Indicates that one entity represents a particular phase, step, or developmental period within the progression or lifecycle of another entity.
  • B. goalStage
    Indicates the specific phase or step a goal is currently in within its overall progression or lifecycle.
  • C. investmentStage
    Indicates the phase or maturity level a company or project is in with respect to receiving investment or funding.
  • D. assessmentLevel
    Indicates the degree, rating, or intensity assigned to an evaluation or judgment of something.
  • E. assessment
    Indicates an evaluation or judgment made about an entity’s quality, performance, or characteristics.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd46391c0c81909fa484446732b6a3 completed March 20, 2026, 1:06 p.m.
NER Named-entity recognition batch_69bd8932b8bc8190bd31e11b167a7212 completed March 20, 2026, 5:51 p.m.
PD Predicate disambiguation batch_69bd84660ea08190a641084814fcf94d completed March 20, 2026, 5:31 p.m.
Created at: March 20, 2026, 2:04 p.m.