Triple

T5401977
Position Surface form Disambiguated ID Type / Status
Subject Seville Metro E120797 entity
Predicate plannedExpansion P54843 FINISHED
Object Line 2
Line 2 is a proposed future line of the Seville Metro intended to expand the city's rapid transit network.
E516811 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Line 2 | Statement: [Seville Metro, plannedExpansion, Line 2]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Line 2
Context triple: [Seville Metro, plannedExpansion, Line 2]
  • A. Line 2
    Line 2 is one of the main lines of the Santiago Metro in Chile, running in a generally north–south direction and serving several central and densely populated areas of the city.
  • B. Line 2
    Line 2 is a major east–west rapid transit route of the Shanghai Metro that connects key commercial, residential, and airport hubs across the city.
  • C. Line 2
    Line 2 is a trolleybus route within Geneva’s public transport system that serves as one of the city’s main electric bus lines.
  • D. Line 2
    Line 2 is a rapid transit line of the Barcelona Metro system that serves several central and northern neighborhoods of the city.
  • E. Line 2
    Line 2 is a planned second rapid transit line of the Turin Metro system in Turin, Italy, intended to expand the city's urban rail network.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Line 2
Triple: [Seville Metro, plannedExpansion, Line 2]
Generated description
Line 2 is a proposed future line of the Seville Metro intended to expand the city's rapid transit network.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Line 2
Target entity description: Line 2 is a proposed future line of the Seville Metro intended to expand the city's rapid transit network.
  • A. Line 2
    Line 2 is a planned second rapid transit line of the Turin Metro system in Turin, Italy, intended to expand the city's urban rail network.
  • B. Line 2
    Line 2 is a planned rapid transit route of the Ho Chi Minh City Metro intended to connect key urban districts and relieve traffic congestion in Vietnam’s largest city.
  • C. Line 2
    Line 2 is a rapid transit line of the Barcelona Metro system that serves several central and northern neighborhoods of the city.
  • D. Line 2
    Line 2 is a major route of Mexico City’s Metrobús bus rapid transit system, running along key thoroughfares to connect important residential and commercial areas.
  • E. Line 2
    Line 2 is a major east–west rapid transit route of the Shanghai Metro that connects key commercial, residential, and airport hubs across the city.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd46391c0c81909fa484446732b6a3 completed March 20, 2026, 1:06 p.m.
NER Named-entity recognition batch_69bd8771b25c819080da247bc3164cd9 completed March 20, 2026, 5:44 p.m.
NED1 Entity disambiguation (via context triple) batch_69bf3388c10481908235da34ef509d37 completed March 22, 2026, 12:10 a.m.
NEDg Description generation batch_69bf341c35088190ae60de75d289ce3c completed March 22, 2026, 12:13 a.m.
NED2 Entity disambiguation (via description) batch_69bf34c52d108190ab3d1c287e745976 completed March 22, 2026, 12:16 a.m.
Created at: March 20, 2026, 2:04 p.m.