Triple

T5401351
Position Surface form Disambiguated ID Type / Status
Subject Sally Corporation E120784 entity
Predicate instanceOf P0 FINISHED
Object themed entertainment company C7337 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: themed entertainment company
Context triple: [Sally Corporation, instanceOf, themed entertainment company]
  • A. theme park operator
    A theme park operator is an entity responsible for managing and overseeing the daily operations, attractions, staff, safety, and guest experience within a theme park.
  • B. amusement ride manufacturer chosen
    An amusement ride manufacturer is a company or entity that designs, engineers, constructs, and often installs mechanical attractions such as roller coasters, carousels, and other rides for amusement parks and entertainment venues.
  • C. cultural theme park
    A cultural theme park is a recreational venue that immerses visitors in the traditions, history, arts, and lifestyles of one or more cultures through themed environments, performances, exhibits, and activities.
  • D. indoor theme park
    An indoor theme park is a fully enclosed entertainment complex featuring climate-controlled rides, attractions, games, and themed environments designed for year-round enjoyment regardless of weather conditions.
  • E. theme park entertainment
    Theme park entertainment encompasses the rides, shows, attractions, and interactive experiences designed to engage and delight visitors within a themed recreational environment.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd46391c0c81909fa484446732b6a3 completed March 20, 2026, 1:06 p.m.
Created at: March 20, 2026, 2:04 p.m.