Triple
T5391106
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Monterey–San Jose Thruway Motorcoach |
E120330
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Amtrak Thruway Motorcoach route |
C18439
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Amtrak Thruway Motorcoach route Context triple: [Monterey–San Jose Thruway Motorcoach, instanceOf, Amtrak Thruway Motorcoach route]
-
A.
Amtrak rolling stock
Amtrak rolling stock comprises the locomotives, passenger cars, and specialized rail vehicles owned or operated by Amtrak for intercity and regional passenger rail service in the United States.
-
B.
rail route
A rail route is a defined path or corridor along which trains operate between specified locations, following a scheduled sequence of stops and track segments.
-
C.
MBTA Commuter Rail station
An MBTA Commuter Rail station is a designated passenger facility along the Massachusetts Bay Transportation Authority’s regional rail network where trains stop to allow riders to board, alight, and connect with other modes of transit.
-
D.
commuter rail line
A commuter rail line is a passenger train service that operates on fixed tracks and schedules to connect suburban or outlying areas with a central city, primarily serving daily work and school commuters.
-
E.
passenger rail service
Passenger rail service is a transportation system that operates trains to carry people between locations on a scheduled basis, typically offering various classes of comfort and amenities.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd46354c648190a38b26f107010a96 |
completed | March 20, 2026, 1:05 p.m. |
Created at: March 20, 2026, 2:04 p.m.