Triple

T5357772
Position Surface form Disambiguated ID Type / Status
Subject La Mesa Watershed E102741 entity
Predicate locatedIn P40 FINISHED
Object Metro Manila E36022 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Metro Manila | Statement: [La Mesa Watershed, locatedIn, Metro Manila]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Metro Manila
Context triple: [La Mesa Watershed, locatedIn, Metro Manila]
  • A. Metro Manila chosen
    Metro Manila is the densely populated national capital region of the Philippines, encompassing Manila and several surrounding cities as the country’s political, economic, and cultural center.
  • B. Quezon City
    Quezon City is a major urban center in Metro Manila known for hosting many national government institutions, universities, and media networks in the Philippines.
  • C. Manila
    Manila is the capital city of the Philippines, a historic and densely populated coastal metropolis that has long served as the country’s political, economic, and cultural center.
  • D. Makati
    Makati is a highly urbanized city in Metro Manila, Philippines, known as the country’s leading financial and business center.
  • E. Lungsod ng Pasig
    Lungsod ng Pasig is a highly urbanized city in Metro Manila, Philippines, known as a major commercial and residential center that includes the Ortigas Center business district.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43d8f7248190b64c140734b5c9a8 completed March 20, 2026, 12:55 p.m.
NER Named-entity recognition batch_69bd863099b081909d20f7014b98de5a completed March 20, 2026, 5:38 p.m.
NED1 Entity disambiguation (via context triple) batch_69bf29008b38819084e59078210626b2 completed March 21, 2026, 11:25 p.m.
Created at: March 20, 2026, 2:01 p.m.