Triple
T5353708
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Mandi district |
E102636
|
entity |
| Predicate | hasHydroelectricProject |
P15311
|
FINISHED |
| Object |
Larji Dam
Larji Dam is a hydroelectric dam on the Beas River in Himachal Pradesh, India, known for power generation and irrigation support in the surrounding region.
|
E515154
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Larji Dam | Statement: [Mandi district, hasHydroelectricProject, Larji Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Larji Dam Context triple: [Mandi district, hasHydroelectricProject, Larji Dam]
-
A.
Lodoyo Dam
Lodoyo Dam is a water control and irrigation structure located on the Brantas River in East Java, Indonesia.
-
B.
Manyame Dam
Manyame Dam is a major reservoir in Zimbabwe that supplies water for irrigation, urban use, and hydroelectric power generation along the Manyame River.
-
C.
Jirau Dam
Jirau Dam is a large hydroelectric power plant in Brazil, built on the Madeira River as part of the country’s major Amazon basin energy infrastructure.
-
D.
Shiroro Dam
Shiroro Dam is a major hydroelectric power facility on the Kaduna River in Niger State, Nigeria, supplying electricity and supporting water management in the region.
-
E.
Surobi Dam
Surobi Dam is a hydroelectric and irrigation dam located on the Kabul River in eastern Afghanistan.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Larji Dam Triple: [Mandi district, hasHydroelectricProject, Larji Dam]
Generated description
Larji Dam is a hydroelectric dam on the Beas River in Himachal Pradesh, India, known for power generation and irrigation support in the surrounding region.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Larji Dam Target entity description: Larji Dam is a hydroelectric dam on the Beas River in Himachal Pradesh, India, known for power generation and irrigation support in the surrounding region.
-
A.
Lodoyo Dam
Lodoyo Dam is a water control and irrigation structure located on the Brantas River in East Java, Indonesia.
-
B.
Manyame Dam
Manyame Dam is a major reservoir in Zimbabwe that supplies water for irrigation, urban use, and hydroelectric power generation along the Manyame River.
-
C.
Jirau Dam
Jirau Dam is a large hydroelectric power plant in Brazil, built on the Madeira River as part of the country’s major Amazon basin energy infrastructure.
-
D.
Shiroro Dam
Shiroro Dam is a major hydroelectric power facility on the Kaduna River in Niger State, Nigeria, supplying electricity and supporting water management in the region.
-
E.
Surobi Dam
Surobi Dam is a hydroelectric and irrigation dam located on the Kabul River in eastern Afghanistan.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd43d8f7248190b64c140734b5c9a8 |
completed | March 20, 2026, 12:55 p.m. |
| NER | Named-entity recognition | batch_69bd86149774819084049a8785e3f2e0 |
completed | March 20, 2026, 5:38 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69bf29193b6c8190bbf0854b4a766009 |
completed | March 21, 2026, 11:26 p.m. |
| NEDg | Description generation | batch_69bf29e0c9708190ac76c8306b76f0fa |
completed | March 21, 2026, 11:29 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69bf2a93efa88190b641924bb652068c |
completed | March 21, 2026, 11:32 p.m. |
Created at: March 20, 2026, 2:01 p.m.