Triple
T5350959
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | The Bat (Canada's Wonderland) |
E124176
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | inverted boomerang roller coaster |
C6016
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: inverted boomerang roller coaster Context triple: [The Bat (Canada's Wonderland), instanceOf, inverted boomerang roller coaster]
-
A.
inverted roller coaster
chosen
An inverted roller coaster is a type of roller coaster where the train travels beneath the track with riders’ legs dangling freely, creating intense, suspended-feeling maneuvers and inversions.
-
B.
roller coaster
A roller coaster is an amusement ride consisting of a track with steep drops, sharp turns, and inversions that carries passengers in open cars for a thrilling, high-speed experience.
-
C.
launched roller coaster
A launched roller coaster is a type of roller coaster that uses propulsion systems such as linear motors, hydraulic launches, or compressed air to rapidly accelerate trains to high speeds without relying on a traditional lift hill.
-
D.
roller coaster variant
A roller coaster variant is a specific type or design of roller coaster that differs in track layout, ride mechanics, theming, or rider experience from standard models.
-
E.
backward roller coaster
A backward roller coaster is an amusement ride where the train primarily travels in reverse along the track, creating disorienting and intensified sensations of speed, drops, and turns.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd464be27081908807b40b75c1bbae |
completed | March 20, 2026, 1:06 p.m. |
Created at: March 20, 2026, 2:01 p.m.