Triple
T5343668
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | SOM Steering Committee on ECOTECH |
E124000
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | APEC committee |
C1999
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: APEC committee Context triple: [SOM Steering Committee on ECOTECH, instanceOf, APEC committee]
-
A.
BIS committee
A BIS committee is a formal group within the Bureau of Indian Standards responsible for developing, reviewing, and maintaining national standards in a specific technical or sectoral domain.
-
B.
central bank committee
A central bank committee is a decision-making body within a central bank responsible for setting and overseeing monetary policy, such as interest rates and liquidity measures, to achieve macroeconomic objectives like price stability and sustainable growth.
-
C.
government committee
chosen
A government committee is a formally established group of officials or representatives tasked with studying specific issues, developing recommendations, and overseeing particular areas of public policy or administration.
-
D.
Dewan
Dewan is a conceptual class representing a formal council or advisory body that provides guidance, deliberation, and decision-making support within a governance or organizational structure.
-
E.
board committee
A board committee is a small, specialized group of board members delegated specific responsibilities to support the board’s governance, oversight, and decision-making functions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd464be27081908807b40b75c1bbae |
completed | March 20, 2026, 1:06 p.m. |
Created at: March 20, 2026, 2:01 p.m.