Triple

T5343668
Position Surface form Disambiguated ID Type / Status
Subject SOM Steering Committee on ECOTECH E124000 entity
Predicate instanceOf P0 FINISHED
Object APEC committee C1999 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: APEC committee
Context triple: [SOM Steering Committee on ECOTECH, instanceOf, APEC committee]
  • A. BIS committee
    A BIS committee is a formal group within the Bureau of Indian Standards responsible for developing, reviewing, and maintaining national standards in a specific technical or sectoral domain.
  • B. central bank committee
    A central bank committee is a decision-making body within a central bank responsible for setting and overseeing monetary policy, such as interest rates and liquidity measures, to achieve macroeconomic objectives like price stability and sustainable growth.
  • C. government committee chosen
    A government committee is a formally established group of officials or representatives tasked with studying specific issues, developing recommendations, and overseeing particular areas of public policy or administration.
  • D. Dewan
    Dewan is a conceptual class representing a formal council or advisory body that provides guidance, deliberation, and decision-making support within a governance or organizational structure.
  • E. board committee
    A board committee is a small, specialized group of board members delegated specific responsibilities to support the board’s governance, oversight, and decision-making functions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd464be27081908807b40b75c1bbae completed March 20, 2026, 1:06 p.m.
Created at: March 20, 2026, 2:01 p.m.