Triple
T5337278
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Belfast City Hospital Tower |
E123855
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | hospital tower |
C94
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: hospital tower Context triple: [Belfast City Hospital Tower, instanceOf, hospital tower]
-
A.
hospital
chosen
A hospital is a healthcare facility where medical professionals diagnose, treat, and care for patients using specialized equipment and services.
-
B.
hospital system facilities
A hospital system facilities class represents the physical infrastructure, equipment, and support services that enable the delivery of healthcare across one or more hospital locations.
-
C.
former hospital building
A former hospital building is a structure that once functioned as a medical care facility but has since been closed, repurposed, or left vacant.
-
D.
hospital ship
A hospital ship is a seafaring vessel specially equipped and staffed to provide medical care and treatment, often in support of military operations or humanitarian missions.
-
E.
medical district
A medical district is a designated urban area where healthcare facilities, such as hospitals, clinics, research centers, and related services, are concentrated to provide comprehensive medical care and support.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd464b07f8819095aa76577c9829e4 |
completed | March 20, 2026, 1:06 p.m. |
Created at: March 20, 2026, 2 p.m.