Triple

T5329242
Position Surface form Disambiguated ID Type / Status
Subject Nice Port E123262 entity
Predicate alsoKnownAs P39 FINISHED
Object Port Lympia E353841 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Port Lympia | Statement: [Nice Port, alsoKnownAs, Port Lympia]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Port Lympia
Context triple: [Nice Port, alsoKnownAs, Port Lympia]
  • A. Port Lympia chosen
    Port Lympia is the historic main harbor of Nice on the French Riviera, known for its marina, ferries, and colorful waterfront buildings.
  • B. The SSE Hydro
    The SSE Hydro is a major indoor arena and entertainment venue in Glasgow, Scotland, known for hosting large-scale concerts and live events.
  • C. Port Olímpic
    Port Olímpic is a modern marina and leisure complex in Barcelona known for its waterfront restaurants, nightlife, and sailing facilities built for the 1992 Olympic Games.
  • D. Washington Harbour complex
    The Washington Harbour complex is a prominent mixed-use development along the Georgetown waterfront in Washington, D.C., featuring offices, restaurants, residences, and public spaces overlooking the Potomac River.
  • E. Queen Elizabeth Olympic Park
    Queen Elizabeth Olympic Park is a large sporting and recreational complex in East London, developed for the 2012 Summer Olympics and now serving as a major public park and events destination.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd46477f9081909d242a327d749466 completed March 20, 2026, 1:06 p.m.
NER Named-entity recognition batch_69bd859552d8819080758bdd7c43c66a completed March 20, 2026, 5:36 p.m.
NED1 Entity disambiguation (via context triple) batch_69bf18b396c08190be60bcb9ac933b5e completed March 21, 2026, 10:16 p.m.
Created at: March 20, 2026, 2 p.m.