Triple

T5326927
Position Surface form Disambiguated ID Type / Status
Subject Central and Southern Florida Project E123208 entity
Predicate instanceOf P0 FINISHED
Object flood control project C1458 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: flood control project
Context triple: [Central and Southern Florida Project, instanceOf, flood control project]
  • A. flood control agency
    A flood control agency is an organization responsible for planning, implementing, and managing measures to prevent, mitigate, and respond to flooding in a specific region.
  • B. water management project chosen
    A water management project is an organized initiative that plans, develops, and operates systems and practices to sustainably collect, store, distribute, and protect water resources for human and environmental needs.
  • C. water transfer project
    A water transfer project is a large-scale infrastructure system designed to move water from regions of surplus to regions of deficit through canals, pipelines, tunnels, and related facilities to meet agricultural, industrial, and domestic needs.
  • D. irrigation dam
    An irrigation dam is a barrier constructed across a watercourse to store and regulate water specifically for agricultural use, enabling controlled distribution to fields and crops.
  • E. lock and dam structure
    A lock and dam structure is an engineered system on a waterway that combines a gated dam to control water levels with a lock chamber to raise and lower vessels between different elevations for safe and efficient navigation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd46477f9081909d242a327d749466 completed March 20, 2026, 1:06 p.m.
Created at: March 20, 2026, 2 p.m.