Triple

T5316499
Position Surface form Disambiguated ID Type / Status
Subject Richland, Georgia E119162 entity
Predicate servedByHighway P385 FINISHED
Object U.S. Route 280 E54415 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Route 280 | Statement: [Richland, Georgia, servedByHighway, U.S. Route 280]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: U.S. Route 280
Context triple: [Richland, Georgia, servedByHighway, U.S. Route 280]
  • A. U.S. Route 280 chosen
    U.S. Route 280 is a major east–west U.S. Highway running from central Alabama through Georgia, connecting cities such as Birmingham, Columbus, and Savannah.
  • B. U.S. Route 380
    U.S. Route 380 is an east–west U.S. highway that runs through New Mexico and Texas, connecting rural communities and regional centers across the southern Great Plains.
  • C. U.S. Route 281
    U.S. Route 281 is a major north–south United States highway that runs from the Mexican border in Texas to the Canadian border in North Dakota, passing through several central states.
  • D. U.S. Route 283
    U.S. Route 283 is a north–south United States highway that runs through several Great Plains states, connecting rural communities and regional centers from Texas to South Dakota.
  • E. U.S. Route 75
    U.S. Route 75 is a major north–south U.S. Highway running from Texas through the central United States, serving as a key transportation corridor for cities such as Dallas.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd446b57bc8190a513d2e6c40314f3 completed March 20, 2026, 12:58 p.m.
NER Named-entity recognition batch_69bd854fd07c8190b4f1c3c8e618c308 completed March 20, 2026, 5:35 p.m.
NED1 Entity disambiguation (via context triple) batch_69c8fa179c008190a6bba55cb62b7fe8 completed March 29, 2026, 10:08 a.m.
Created at: March 20, 2026, 1:54 p.m.