Triple

T5313755
Position Surface form Disambiguated ID Type / Status
Subject Penzance to Dundee service E119094 entity
Predicate instanceOf P0 FINISHED
Object cross-country train service C75 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: cross-country train service
Context triple: [Penzance to Dundee service, instanceOf, cross-country train service]
  • A. intercity coach service
    An intercity coach service is a scheduled, long-distance bus transportation system that carries passengers between cities or towns, typically offering reserved seating, luggage capacity, and limited intermediate stops.
  • B. passenger rail service chosen
    Passenger rail service is a transportation system that operates trains to carry people between locations on a scheduled basis, typically offering various classes of comfort and amenities.
  • C. commuter rail line
    A commuter rail line is a passenger train service that operates on fixed tracks and schedules to connect suburban or outlying areas with a central city, primarily serving daily work and school commuters.
  • D. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • E. passenger train
    A passenger train is a rail vehicle or series of connected vehicles designed to transport people and their luggage between stations along a fixed route and schedule.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd446b57bc8190a513d2e6c40314f3 completed March 20, 2026, 12:58 p.m.
Created at: March 20, 2026, 1:54 p.m.