Triple

T5313220
Position Surface form Disambiguated ID Type / Status
Subject DB Regio E119083 entity
Predicate instanceOf P0 FINISHED
Object regional rail operator C221 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: regional rail operator
Context triple: [DB Regio, instanceOf, regional rail operator]
  • A. transport infrastructure operator
    A transport infrastructure operator is an entity responsible for managing, maintaining, and regulating transportation networks and facilities such as roads, railways, ports, or airports to ensure safe and efficient movement of people and goods.
  • B. mass transit operator chosen
    A mass transit operator is an entity responsible for managing, coordinating, and providing public transportation services such as buses, trains, or subways within a specific region or network.
  • C. rail transport company
    A rail transport company is an organization that owns, operates, or manages trains and railway infrastructure to provide freight and/or passenger transportation services.
  • D. private railway company
    A private railway company is a non-governmental business entity that owns, operates, or manages rail transport services for passengers and/or freight, typically for profit under regulatory oversight.
  • E. common carrier railroad
    A common carrier railroad is a rail transport company that offers freight and/or passenger services to the general public under legal obligation to serve all customers without discrimination, according to published rates and schedules.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd446b57bc8190a513d2e6c40314f3 completed March 20, 2026, 12:58 p.m.
Created at: March 20, 2026, 1:54 p.m.