Triple
T5299574
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Pont de Neuilly |
E119942
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bridge over the Seine |
C12063
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bridge over the Seine Context triple: [Pont de Neuilly, instanceOf, bridge over the Seine]
-
A.
bridge in France
chosen
A bridge in France is a constructed structure that spans physical obstacles such as rivers, valleys, or roads within French territory to provide a transportation route for vehicles, pedestrians, or railways.
-
B.
iron bridge
An iron bridge is a structural crossing composed primarily of iron elements, designed to span physical obstacles such as rivers or valleys while supporting loads like vehicles, pedestrians, or trains.
-
C.
Hudson River bridge
A Hudson River bridge is a large transportation structure spanning the Hudson River to connect communities and facilitate the movement of vehicles, trains, pedestrians, or utilities between its banks.
-
D.
bridge in New York City
A bridge in New York City is a large-scale transportation structure spanning waterways or land to connect boroughs and neighborhoods, supporting vehicular, rail, bicycle, and pedestrian traffic within the city’s dense urban environment.
-
E.
tram bridge
A tram bridge is a dedicated elevated structure that carries tram tracks over obstacles such as roads, rivers, or other terrain features to ensure uninterrupted tramway operation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd446f22b88190b6a47fb91c68a3e7 |
completed | March 20, 2026, 12:58 p.m. |
Created at: March 20, 2026, 1:53 p.m.