Triple
T5298946
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | M15 bus |
E119927
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | New York City bus route |
C18347
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: New York City bus route Context triple: [M15 bus, instanceOf, New York City bus route]
-
A.
New York City Subway service designation
A New York City Subway service designation is a letter, number, or symbol that identifies a specific subway route, indicating its line, terminals, and general service pattern for riders.
-
B.
New York City community board
A New York City community board is a local advisory group of appointed residents that consults on land use, budget, and service delivery issues within a specific community district.
-
C.
location in Manhattan
A location in Manhattan represents a specific, identifiable place within the borough’s geographic boundaries, such as an address, landmark, intersection, or point of interest.
-
D.
New York City Subway infrastructure project
A New York City Subway infrastructure project is a coordinated planning, construction, and modernization effort aimed at building, upgrading, or maintaining the physical and technological systems that support subway service across the city.
-
E.
New York City Subway–railroad interchange
A New York City Subway–railroad interchange is a facility or location where subway lines physically connect with or provide direct transfer to mainline or commuter rail services, enabling passenger and sometimes equipment movement between the two systems.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd446f22b88190b6a47fb91c68a3e7 |
completed | March 20, 2026, 12:58 p.m. |
Created at: March 20, 2026, 1:53 p.m.