Triple

T5276231
Position Surface form Disambiguated ID Type / Status
Subject Water Resources Development Act of 2000 E119376 entity
Predicate follows P134 FINISHED
Object Water Resources Development Act of 1996
The Water Resources Development Act of 1996 is a United States federal law that authorized and funded a wide range of U.S. Army Corps of Engineers projects for navigation, flood control, and environmental restoration of the nation’s water resources.
E508671 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Water Resources Development Act of 1996 | Statement: [Water Resources Development Act of 2000, follows, Water Resources Development Act of 1996]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Water Resources Development Act of 1996
Context triple: [Water Resources Development Act of 2000, follows, Water Resources Development Act of 1996]
  • A. Water Resources Development Act of 2000
    The Water Resources Development Act of 2000 is a U.S. federal law that authorized major civil works projects by the Army Corps of Engineers, notably launching large-scale ecosystem restoration and water management initiatives such as those in the Florida Everglades.
  • B. Boulder Canyon Project Act
    The Boulder Canyon Project Act is a 1928 U.S. federal law that authorized the construction of Hoover Dam and the All-American Canal, enabling large-scale water storage and hydroelectric power development on the Colorado River.
  • C. Federal Water Power Act of 1920
    The Federal Water Power Act of 1920 was a U.S. law that established a comprehensive federal licensing and regulatory framework for hydroelectric power development on navigable waters and public lands.
  • D. Bonneville Project Act of 1937
    The Bonneville Project Act of 1937 is a U.S. federal law that created the Bonneville Power Administration and established the framework for marketing and transmitting hydroelectric power from the Columbia River dams in the Pacific Northwest.
  • E. Flood Control Act of 1944
    The Flood Control Act of 1944 is a landmark U.S. law that authorized major multipurpose water projects, shaping the modern federal system for flood control, navigation, irrigation, and hydroelectric power development.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Water Resources Development Act of 1996
Triple: [Water Resources Development Act of 2000, follows, Water Resources Development Act of 1996]
Generated description
The Water Resources Development Act of 1996 is a United States federal law that authorized and funded a wide range of U.S. Army Corps of Engineers projects for navigation, flood control, and environmental restoration of the nation’s water resources.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Water Resources Development Act of 1996
Target entity description: The Water Resources Development Act of 1996 is a United States federal law that authorized and funded a wide range of U.S. Army Corps of Engineers projects for navigation, flood control, and environmental restoration of the nation’s water resources.
  • A. Water Resources Development Act of 2000
    The Water Resources Development Act of 2000 is a U.S. federal law that authorized major civil works projects by the Army Corps of Engineers, notably launching large-scale ecosystem restoration and water management initiatives such as those in the Florida Everglades.
  • B. Boulder Canyon Project Act
    The Boulder Canyon Project Act is a 1928 U.S. federal law that authorized the construction of Hoover Dam and the All-American Canal, enabling large-scale water storage and hydroelectric power development on the Colorado River.
  • C. Federal Water Power Act of 1920
    The Federal Water Power Act of 1920 was a U.S. law that established a comprehensive federal licensing and regulatory framework for hydroelectric power development on navigable waters and public lands.
  • D. Bonneville Project Act of 1937
    The Bonneville Project Act of 1937 is a U.S. federal law that created the Bonneville Power Administration and established the framework for marketing and transmitting hydroelectric power from the Columbia River dams in the Pacific Northwest.
  • E. Flood Control Act of 1944
    The Flood Control Act of 1944 is a landmark U.S. law that authorized major multipurpose water projects, shaping the modern federal system for flood control, navigation, irrigation, and hydroelectric power development.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd446c38e081908cdaf113bdf86790 completed March 20, 2026, 12:58 p.m.
NER Named-entity recognition batch_69bd8472bee08190a42d8f4714965d95 completed March 20, 2026, 5:31 p.m.
NED1 Entity disambiguation (via context triple) batch_69bf06d611a88190b1afc9161620223b completed March 21, 2026, 9 p.m.
NEDg Description generation batch_69bf095993c88190b75927b61eef15dc completed March 21, 2026, 9:10 p.m.
NED2 Entity disambiguation (via description) batch_69bf09c3f7048190bb8724fc64d35696 completed March 21, 2026, 9:12 p.m.
Created at: March 20, 2026, 1:51 p.m.