Triple
T5230830
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | National Cooperative Highway Research Program |
E118105
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | transportation research program |
C17874
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: transportation research program Context triple: [National Cooperative Highway Research Program, instanceOf, transportation research program]
-
A.
transportation organization
A transportation organization is an entity that plans, manages, and operates systems or services that move people or goods from one location to another.
-
B.
transportation safety agency
A transportation safety agency is an organization responsible for regulating, monitoring, and enforcing safety standards across transportation systems to prevent accidents and protect the public.
-
C.
public transit and highway improvement program
A public transit and highway improvement program is a coordinated set of projects and policies designed to enhance the capacity, safety, efficiency, and accessibility of transportation networks through upgrades to roads, highways, and mass transit systems.
-
D.
public transport information system
A public transport information system is a software platform that collects, processes, and disseminates real-time and scheduled data about public transit services to passengers, operators, and other stakeholders.
-
E.
intelligent transportation system component
An intelligent transportation system component is a hardware or software element that collects, processes, or communicates transportation-related data to optimize traffic flow, enhance safety, and improve overall system efficiency.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd4466fb8c819083b806a79414d7e4 |
completed | March 20, 2026, 12:58 p.m. |
Created at: March 20, 2026, 1:48 p.m.