Triple

T5230830
Position Surface form Disambiguated ID Type / Status
Subject National Cooperative Highway Research Program E118105 entity
Predicate instanceOf P0 FINISHED
Object transportation research program C17874 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: transportation research program
Context triple: [National Cooperative Highway Research Program, instanceOf, transportation research program]
  • A. transportation organization
    A transportation organization is an entity that plans, manages, and operates systems or services that move people or goods from one location to another.
  • B. transportation safety agency
    A transportation safety agency is an organization responsible for regulating, monitoring, and enforcing safety standards across transportation systems to prevent accidents and protect the public.
  • C. public transit and highway improvement program
    A public transit and highway improvement program is a coordinated set of projects and policies designed to enhance the capacity, safety, efficiency, and accessibility of transportation networks through upgrades to roads, highways, and mass transit systems.
  • D. public transport information system
    A public transport information system is a software platform that collects, processes, and disseminates real-time and scheduled data about public transit services to passengers, operators, and other stakeholders.
  • E. intelligent transportation system component
    An intelligent transportation system component is a hardware or software element that collects, processes, or communicates transportation-related data to optimize traffic flow, enhance safety, and improve overall system efficiency.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd4466fb8c819083b806a79414d7e4 completed March 20, 2026, 12:58 p.m.
Created at: March 20, 2026, 1:48 p.m.