Triple
T5230179
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Mir EO-21 |
E118090
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | long-duration spaceflight mission |
C7206
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: long-duration spaceflight mission Context triple: [Mir EO-21, instanceOf, long-duration spaceflight mission]
-
A.
crewed spaceflight mission
chosen
A crewed spaceflight mission is an organized operation that sends humans into space to perform specific scientific, exploratory, operational, or technological objectives before safely returning them to Earth or another destination.
-
B.
space mission
A space mission is a planned and coordinated endeavor to send spacecraft, instruments, or humans beyond Earth's atmosphere to achieve specific scientific, exploratory, commercial, or technological objectives.
-
C.
interplanetary space mission
An interplanetary space mission is a coordinated endeavor that sends spacecraft from one planet to another to conduct scientific research, exploration, or technology demonstration beyond Earth's immediate environment.
-
D.
orbital spaceflight
Orbital spaceflight is the process of launching a spacecraft into a stable, continuous orbit around a celestial body, typically Earth, by achieving sufficient horizontal velocity to balance gravitational pull.
-
E.
Space Shuttle mission
A Space Shuttle mission is a coordinated spaceflight operation using the Space Shuttle orbiter to transport crew, cargo, and conduct scientific or technical objectives in Earth orbit and beyond.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd4466fb8c819083b806a79414d7e4 |
completed | March 20, 2026, 12:58 p.m. |
Created at: March 20, 2026, 1:48 p.m.