Triple

T5224958
Position Surface form Disambiguated ID Type / Status
Subject STS-120 E117961 entity
Predicate issExpeditionRotation P62138 FINISHED
Object Expedition 15 to Expedition 16
Expedition 15 to Expedition 16 refers to the transition period between two long-duration International Space Station crews, marked by the handover of station operations and responsibilities from the outgoing Expedition 15 team to the incoming Expedition 16 crew.
E503840 NE FINISHED

How this triple was built (5 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Expedition 15 to Expedition 16 | Statement: [STS-120, issExpeditionRotation, Expedition 15 to Expedition 16]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Expedition 15 to Expedition 16
Context triple: [STS-120, issExpeditionRotation, Expedition 15 to Expedition 16]
  • A. International Space Station Expedition 26
    International Space Station Expedition 26 was a long-duration mission aboard the ISS during 2010–2011, involving an international crew conducting scientific research and station maintenance in low Earth orbit.
  • B. Expedition 28
    Expedition 28 was a long-duration crewed mission to the International Space Station in 2011, overseeing scientific research and station operations during the final flights of the Space Shuttle program.
  • C. Shuttle–Mir Program
    The Shuttle–Mir Program was a collaborative U.S.–Russian space initiative in the 1990s that docked American Space Shuttles with the Russian Mir space station to advance long-duration human spaceflight and foster post–Cold War cooperation.
  • D. STS-116
    STS-116 was a 2006 Space Shuttle Discovery mission to the International Space Station that delivered and reconfigured key structural and power components as part of the station’s assembly.
  • E. STS-60
    STS-60 was a 1994 NASA Space Shuttle Discovery mission notable as the first joint U.S.–Russian crewed spaceflight, carrying Russian cosmonaut Sergei Krikalev.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Expedition 15 to Expedition 16
Triple: [STS-120, issExpeditionRotation, Expedition 15 to Expedition 16]
Generated description
Expedition 15 to Expedition 16 refers to the transition period between two long-duration International Space Station crews, marked by the handover of station operations and responsibilities from the outgoing Expedition 15 team to the incoming Expedition 16 crew.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Expedition 15 to Expedition 16
Target entity description: Expedition 15 to Expedition 16 refers to the transition period between two long-duration International Space Station crews, marked by the handover of station operations and responsibilities from the outgoing Expedition 15 team to the incoming Expedition 16 crew.
  • A. International Space Station Expedition 26
    International Space Station Expedition 26 was a long-duration mission aboard the ISS during 2010–2011, involving an international crew conducting scientific research and station maintenance in low Earth orbit.
  • B. Expedition 28
    Expedition 28 was a long-duration crewed mission to the International Space Station in 2011, overseeing scientific research and station operations during the final flights of the Space Shuttle program.
  • C. Shuttle–Mir Program
    The Shuttle–Mir Program was a collaborative U.S.–Russian space initiative in the 1990s that docked American Space Shuttles with the Russian Mir space station to advance long-duration human spaceflight and foster post–Cold War cooperation.
  • D. STS-116
    STS-116 was a 2006 Space Shuttle Discovery mission to the International Space Station that delivered and reconfigured key structural and power components as part of the station’s assembly.
  • E. STS-60
    STS-60 was a 1994 NASA Space Shuttle Discovery mission notable as the first joint U.S.–Russian crewed spaceflight, carrying Russian cosmonaut Sergei Krikalev.
  • F. None of above. chosen
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: issExpeditionRotation
Context triple: [STS-120, issExpeditionRotation, Expedition 15 to Expedition 16]
  • A. hasNotableExpedition
    Indicates that an entity is associated with a significant or noteworthy expedition, journey, or exploratory mission.
  • B. describesExpedition
    Indicates that one entity provides a detailed account or characterization of an expedition undertaken by another entity.
  • C. expeditionObjective
    Indicates the primary goal or purpose that an expedition is intended to achieve.
  • D. expeditionDepartureDate
    Indicates the date on which an expedition is scheduled to or actually does depart.
  • E. numberOfExpeditions
    Indicates the total count of expeditions associated with a given entity or context.
  • F. None of above. chosen

Provenance (7 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd4465e03081909bfcfd7113062590 completed March 20, 2026, 12:58 p.m.
NER Named-entity recognition batch_69bd7adb034c819086bf8a85fbf158f4 completed March 20, 2026, 4:50 p.m.
NED1 Entity disambiguation (via context triple) batch_69beeffc51888190938dc157b14c4b6c completed March 21, 2026, 7:22 p.m.
NEDg Description generation batch_69bef0b2b6448190be1c465738be741b completed March 21, 2026, 7:25 p.m.
NED2 Entity disambiguation (via description) batch_69bef121817c8190aebd27ee34c0a419 completed March 21, 2026, 7:27 p.m.
PD Predicate disambiguation batch_69bd77bd2a448190a9ae5afd2585a7b9 completed March 20, 2026, 4:37 p.m.
PDg Predicate description generation batch_69bd78a89b608190b259d3d8658f8f7c completed March 20, 2026, 4:41 p.m.
Created at: March 20, 2026, 1:48 p.m.