Triple
T5224958
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | STS-120 |
E117961
|
entity |
| Predicate | issExpeditionRotation |
P62138
|
FINISHED |
| Object |
Expedition 15 to Expedition 16
Expedition 15 to Expedition 16 refers to the transition period between two long-duration International Space Station crews, marked by the handover of station operations and responsibilities from the outgoing Expedition 15 team to the incoming Expedition 16 crew.
|
E503840
|
NE FINISHED |
How this triple was built (5 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Expedition 15 to Expedition 16 | Statement: [STS-120, issExpeditionRotation, Expedition 15 to Expedition 16]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Expedition 15 to Expedition 16 Context triple: [STS-120, issExpeditionRotation, Expedition 15 to Expedition 16]
-
A.
International Space Station Expedition 26
International Space Station Expedition 26 was a long-duration mission aboard the ISS during 2010–2011, involving an international crew conducting scientific research and station maintenance in low Earth orbit.
-
B.
Expedition 28
Expedition 28 was a long-duration crewed mission to the International Space Station in 2011, overseeing scientific research and station operations during the final flights of the Space Shuttle program.
-
C.
Shuttle–Mir Program
The Shuttle–Mir Program was a collaborative U.S.–Russian space initiative in the 1990s that docked American Space Shuttles with the Russian Mir space station to advance long-duration human spaceflight and foster post–Cold War cooperation.
-
D.
STS-116
STS-116 was a 2006 Space Shuttle Discovery mission to the International Space Station that delivered and reconfigured key structural and power components as part of the station’s assembly.
-
E.
STS-60
STS-60 was a 1994 NASA Space Shuttle Discovery mission notable as the first joint U.S.–Russian crewed spaceflight, carrying Russian cosmonaut Sergei Krikalev.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Expedition 15 to Expedition 16 Triple: [STS-120, issExpeditionRotation, Expedition 15 to Expedition 16]
Generated description
Expedition 15 to Expedition 16 refers to the transition period between two long-duration International Space Station crews, marked by the handover of station operations and responsibilities from the outgoing Expedition 15 team to the incoming Expedition 16 crew.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Expedition 15 to Expedition 16 Target entity description: Expedition 15 to Expedition 16 refers to the transition period between two long-duration International Space Station crews, marked by the handover of station operations and responsibilities from the outgoing Expedition 15 team to the incoming Expedition 16 crew.
-
A.
International Space Station Expedition 26
International Space Station Expedition 26 was a long-duration mission aboard the ISS during 2010–2011, involving an international crew conducting scientific research and station maintenance in low Earth orbit.
-
B.
Expedition 28
Expedition 28 was a long-duration crewed mission to the International Space Station in 2011, overseeing scientific research and station operations during the final flights of the Space Shuttle program.
-
C.
Shuttle–Mir Program
The Shuttle–Mir Program was a collaborative U.S.–Russian space initiative in the 1990s that docked American Space Shuttles with the Russian Mir space station to advance long-duration human spaceflight and foster post–Cold War cooperation.
-
D.
STS-116
STS-116 was a 2006 Space Shuttle Discovery mission to the International Space Station that delivered and reconfigured key structural and power components as part of the station’s assembly.
-
E.
STS-60
STS-60 was a 1994 NASA Space Shuttle Discovery mission notable as the first joint U.S.–Russian crewed spaceflight, carrying Russian cosmonaut Sergei Krikalev.
- F. None of above. chosen
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: issExpeditionRotation Context triple: [STS-120, issExpeditionRotation, Expedition 15 to Expedition 16]
-
A.
hasNotableExpedition
Indicates that an entity is associated with a significant or noteworthy expedition, journey, or exploratory mission.
-
B.
describesExpedition
Indicates that one entity provides a detailed account or characterization of an expedition undertaken by another entity.
-
C.
expeditionObjective
Indicates the primary goal or purpose that an expedition is intended to achieve.
-
D.
expeditionDepartureDate
Indicates the date on which an expedition is scheduled to or actually does depart.
-
E.
numberOfExpeditions
Indicates the total count of expeditions associated with a given entity or context.
- F. None of above. chosen
Provenance (7 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd4465e03081909bfcfd7113062590 |
completed | March 20, 2026, 12:58 p.m. |
| NER | Named-entity recognition | batch_69bd7adb034c819086bf8a85fbf158f4 |
completed | March 20, 2026, 4:50 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69beeffc51888190938dc157b14c4b6c |
completed | March 21, 2026, 7:22 p.m. |
| NEDg | Description generation | batch_69bef0b2b6448190be1c465738be741b |
completed | March 21, 2026, 7:25 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69bef121817c8190aebd27ee34c0a419 |
completed | March 21, 2026, 7:27 p.m. |
| PD | Predicate disambiguation | batch_69bd77bd2a448190a9ae5afd2585a7b9 |
completed | March 20, 2026, 4:37 p.m. |
| PDg | Predicate description generation | batch_69bd78a89b608190b259d3d8658f8f7c |
completed | March 20, 2026, 4:41 p.m. |
Created at: March 20, 2026, 1:48 p.m.