Triple

T5223133
Position Surface form Disambiguated ID Type / Status
Subject Independence Mall redesign, Philadelphia E117920 entity
Predicate instanceOf P0 FINISHED
Object urban landscape project C6939 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: urban landscape project
Context triple: [Independence Mall redesign, Philadelphia, instanceOf, urban landscape project]
  • A. urban design project chosen
    An urban design project is a coordinated planning and design effort that shapes the physical form, public spaces, infrastructure, and land use of a specific urban area to improve its functionality, aesthetics, and livability.
  • B. urban skyline
    An urban skyline is the distinctive outline of a city formed by the arrangement and silhouette of its buildings and structures against the sky.
  • C. urban public space
    An urban public space is a publicly accessible area within a city—such as streets, parks, plazas, and squares—designed or used for social interaction, movement, recreation, and civic life.
  • D. urban development
    Urban development is the planned growth and improvement of cities and towns through the design, regulation, and construction of buildings, infrastructure, and public spaces to support economic, social, and environmental needs.
  • E. urban plaza
    An urban plaza is a publicly accessible open space within a city, typically surrounded by buildings and streets, designed to support social interaction, circulation, and civic activities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd4465e03081909bfcfd7113062590 completed March 20, 2026, 12:58 p.m.
Created at: March 20, 2026, 1:48 p.m.