Triple

T5209009
Position Surface form Disambiguated ID Type / Status
Subject St. Peter’s Episcopal Church (Chelsea, New York, work/alterations) E117583 entity
Predicate instanceOf P0 FINISHED
Object church renovation project C5246 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: church renovation project
Context triple: [St. Peter’s Episcopal Church (Chelsea, New York, work/alterations), instanceOf, church renovation project]
  • A. architectural renovation project chosen
    An architectural renovation project is a coordinated effort to redesign, upgrade, and adapt an existing building or space to meet new functional, aesthetic, regulatory, and sustainability requirements while preserving or enhancing its structural integrity and character.
  • B. former church
    A former church is a building that was originally constructed and used for religious worship but has since been deconsecrated or repurposed for secular or alternative functions.
  • C. architectural remodeling project
    An architectural remodeling project is a coordinated effort to redesign, upgrade, or reconfigure an existing structure’s spaces, systems, and aesthetics to better meet current functional, regulatory, and stylistic requirements.
  • D. court church
    A court church is a Christian place of worship that is directly associated with and often located near a royal or princely court, serving the spiritual needs and ceremonial functions of the ruling household.
  • E. Historic church
    A historic church is a long-standing religious building of significant architectural, cultural, and spiritual importance that reflects the beliefs, artistry, and community life of its era.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd4464ba3c8190bc16b2ebbe42ddb0 completed March 20, 2026, 12:58 p.m.
Created at: March 20, 2026, 1:47 p.m.