Triple

T5207358
Position Surface form Disambiguated ID Type / Status
Subject Gensler E117543 entity
Predicate notableProject P4 FINISHED
Object San Francisco International Airport Terminal 2 renovation
The San Francisco International Airport Terminal 2 renovation is a major redesign project that transformed the terminal into a modern, passenger-focused facility emphasizing sustainability, comfort, and innovative design.
E503660 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: San Francisco International Airport Terminal 2 renovation | Statement: [Gensler, notableProject, San Francisco International Airport Terminal 2 renovation]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: San Francisco International Airport Terminal 2 renovation
Context triple: [Gensler, notableProject, San Francisco International Airport Terminal 2 renovation]
  • A. San Francisco International Airport AirTrain system
    The San Francisco International Airport AirTrain system is an automated people mover that transports passengers between airport terminals, parking garages, rental car facilities, and the Bay Area Rapid Transit (BART) station at SFO.
  • B. San Francisco Central Subway project
    The San Francisco Central Subway project is a major Muni Metro light rail extension in San Francisco designed to improve north–south transit connectivity by linking neighborhoods such as SoMa, Union Square, and Chinatown.
  • C. BART Silicon Valley extension
    The BART Silicon Valley extension is a major Bay Area Rapid Transit project extending rail service into Santa Clara County, including new stations in San José and surrounding areas.
  • D. LAX terminal complex
    The LAX terminal complex is the large, multi-terminal passenger facility at Los Angeles International Airport that houses its gates, check-in areas, and passenger services.
  • E. Transbay Transit Center
    The Transbay Transit Center is a major transportation hub and rooftop park complex in downtown San Francisco that serves regional buses and future rail connections.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: San Francisco International Airport Terminal 2 renovation
Triple: [Gensler, notableProject, San Francisco International Airport Terminal 2 renovation]
Generated description
The San Francisco International Airport Terminal 2 renovation is a major redesign project that transformed the terminal into a modern, passenger-focused facility emphasizing sustainability, comfort, and innovative design.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: San Francisco International Airport Terminal 2 renovation
Target entity description: The San Francisco International Airport Terminal 2 renovation is a major redesign project that transformed the terminal into a modern, passenger-focused facility emphasizing sustainability, comfort, and innovative design.
  • A. San Francisco International Airport AirTrain system
    The San Francisco International Airport AirTrain system is an automated people mover that transports passengers between airport terminals, parking garages, rental car facilities, and the Bay Area Rapid Transit (BART) station at SFO.
  • B. San Francisco Central Subway project
    The San Francisco Central Subway project is a major Muni Metro light rail extension in San Francisco designed to improve north–south transit connectivity by linking neighborhoods such as SoMa, Union Square, and Chinatown.
  • C. BART Silicon Valley extension
    The BART Silicon Valley extension is a major Bay Area Rapid Transit project extending rail service into Santa Clara County, including new stations in San José and surrounding areas.
  • D. LAX terminal complex
    The LAX terminal complex is the large, multi-terminal passenger facility at Los Angeles International Airport that houses its gates, check-in areas, and passenger services.
  • E. Transbay Transit Center
    The Transbay Transit Center is a major transportation hub and rooftop park complex in downtown San Francisco that serves regional buses and future rail connections.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd4463dd3c81909966123f20b79d57 completed March 20, 2026, 12:58 p.m.
NER Named-entity recognition batch_69bd7a4a7b7c8190af5a7149f8fe4f87 completed March 20, 2026, 4:48 p.m.
NED1 Entity disambiguation (via context triple) batch_69beefcf89d8819080541b49c8ad6589 completed March 21, 2026, 7:21 p.m.
NEDg Description generation batch_69bef0856a088190a4d6df4888533388 completed March 21, 2026, 7:24 p.m.
NED2 Entity disambiguation (via description) batch_69bef121817c8190aebd27ee34c0a419 completed March 21, 2026, 7:27 p.m.
Created at: March 20, 2026, 1:47 p.m.