Triple

T5197789
Position Surface form Disambiguated ID Type / Status
Subject X-32 E117314 entity
Predicate instanceOf P0 FINISHED
Object Boeing X-plane C6078 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Boeing X-plane
Context triple: [X-32, instanceOf, Boeing X-plane]
  • A. X-plane chosen
    An X-plane is an experimental aircraft designed to test and demonstrate new aviation technologies, configurations, or performance capabilities beyond those of conventional aircraft.
  • B. Boeing 707 derivative
    A Boeing 707 derivative is any aircraft model developed from the original Boeing 707 airframe, incorporating modifications such as structural changes, updated systems, or specialized configurations while retaining its core design lineage.
  • C. Boeing 747 variant
    A Boeing 747 variant is a specific model or configuration of the Boeing 747 airliner, distinguished by differences in size, range, engines, avionics, or interior layout tailored to particular airline or mission requirements.
  • D. retired presidential aircraft
    A retired presidential aircraft is a former government-operated airplane that once served as official air transport for a nation's head of state but has since been decommissioned from active presidential service.
  • E. stretched airliner variant
    A stretched airliner variant is a lengthened version of an existing aircraft model, typically achieved by adding fuselage sections to increase passenger or cargo capacity while retaining most of the original design and systems.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd4462ed04819084fcb01eb9d2fa74 completed March 20, 2026, 12:58 p.m.
Created at: March 20, 2026, 1:46 p.m.