Triple

T5186678
Position Surface form Disambiguated ID Type / Status
Subject A10 motorway (Berliner Ring) E117047 entity
Predicate hasRouteNumber P1864 FINISHED
Object A10
A10 is the route designation for a major German autobahn that forms the orbital Berliner Ring encircling the city of Berlin.
E501880 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A10 | Statement: [A10 motorway (Berliner Ring), hasRouteNumber, A10]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: A10
Context triple: [A10 motorway (Berliner Ring), hasRouteNumber, A10]
  • A. A10
    The A10 is a major road in England that runs from London northwards through Hertfordshire and Cambridgeshire, forming a key route between the capital and East Anglia.
  • B. A10
    A10 is a major Austrian motorway forming part of the Tauern Autobahn, an important north–south transit route through the Alps.
  • C. A10
    A10 is a major orbital motorway encircling Amsterdam in the Netherlands, connecting various national highways and providing primary access to the city.
  • D. A14
    A14 is a major trunk road in England that forms a key east–west freight and commuter route linking the Midlands to the East Coast ports.
  • E. A12
    The A12 is a major road in England that connects London with East Anglia, serving key towns and cities including Ipswich and Colchester.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: A10
Triple: [A10 motorway (Berliner Ring), hasRouteNumber, A10]
Generated description
A10 is the route designation for a major German autobahn that forms the orbital Berliner Ring encircling the city of Berlin.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: A10
Target entity description: A10 is the route designation for a major German autobahn that forms the orbital Berliner Ring encircling the city of Berlin.
  • A. A10
    The A10 is a major road in England that runs from London northwards through Hertfordshire and Cambridgeshire, forming a key route between the capital and East Anglia.
  • B. A10
    A10 is a major Austrian motorway forming part of the Tauern Autobahn, an important north–south transit route through the Alps.
  • C. A10
    A10 is a major orbital motorway encircling Amsterdam in the Netherlands, connecting various national highways and providing primary access to the city.
  • D. A14
    A14 is a major trunk road in England that forms a key east–west freight and commuter route linking the Midlands to the East Coast ports.
  • E. A12
    The A12 is a major road in England that connects London with East Anglia, serving key towns and cities including Ipswich and Colchester.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd44620ff48190bcac01782107a397 completed March 20, 2026, 12:58 p.m.
NER Named-entity recognition batch_69bd79c3e9e08190848be4208b72f310 completed March 20, 2026, 4:45 p.m.
NED1 Entity disambiguation (via context triple) batch_69bee08807748190ae8f34a6e8875c15 completed March 21, 2026, 6:16 p.m.
NEDg Description generation batch_69bee66191dc8190847fe13f2cda0000 completed March 21, 2026, 6:41 p.m.
NED2 Entity disambiguation (via description) batch_69bee6e8bbcc819094f5f04743eb4013 completed March 21, 2026, 6:43 p.m.
Created at: March 20, 2026, 1:46 p.m.