Triple
T5184819
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Environmental Laboratory |
E117003
|
entity |
| Predicate | client |
P27
|
FINISHED |
| Object | U.S. Army Corps of Engineers Civil Works Program |
E3298
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Army Corps of Engineers Civil Works Program | Statement: [Environmental Laboratory, client, U.S. Army Corps of Engineers Civil Works Program]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: U.S. Army Corps of Engineers Civil Works Program Context triple: [Environmental Laboratory, client, U.S. Army Corps of Engineers Civil Works Program]
-
A.
U.S. Army Corps of Engineers
chosen
The U.S. Army Corps of Engineers is a federal agency within the U.S. Department of Defense responsible for designing, building, and maintaining military and civil engineering projects such as dams, waterways, and infrastructure.
-
B.
Division of Reclamation
The Division of Reclamation is a unit of Indiana’s state government responsible for overseeing the restoration and regulation of lands affected by mining and related resource extraction activities.
-
C.
Bureau of Reclamation
The Bureau of Reclamation is a U.S. federal agency responsible for managing water resources and operating dams, reservoirs, and irrigation projects primarily in the western United States.
-
D.
Columbia Basin Project
The Columbia Basin Project is a large-scale irrigation and hydroelectric development in central Washington State that distributes water and power from the Grand Coulee Dam to support agriculture, industry, and communities across the region.
-
E.
Chena River Lakes Flood Control Project
The Chena River Lakes Flood Control Project is a U.S. Army Corps of Engineers system of dams, levees, and related structures near Fairbanks, Alaska, designed to reduce flooding along the Chena River and protect surrounding communities.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd44620ff48190bcac01782107a397 |
completed | March 20, 2026, 12:58 p.m. |
| NER | Named-entity recognition | batch_69bd79c1354c81908176703b4853c1a4 |
completed | March 20, 2026, 4:45 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69bee085177c8190afce36104b3e3809 |
completed | March 21, 2026, 6:16 p.m. |
Created at: March 20, 2026, 1:46 p.m.