Triple

T5171894
Position Surface form Disambiguated ID Type / Status
Subject IEEE 802.1Qdm E116702 entity
Predicate instanceOf P0 FINISHED
Object resource management standard C3014 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: resource management standard
Context triple: [IEEE 802.1Qdm, instanceOf, resource management standard]
  • A. flow management standard
    A flow management standard defines the rules, processes, and guidelines for efficiently controlling, coordinating, and optimizing the movement of resources, information, or work through a system or network.
  • B. military standard
    A military standard is an officially established set of technical, procedural, or quality requirements used by armed forces to ensure compatibility, reliability, and uniformity of equipment, systems, and practices.
  • C. software standard chosen
    A software standard is an agreed-upon set of rules, formats, and practices that ensures compatibility, interoperability, and quality across different software systems and components.
  • D. resource conflict
    A resource conflict occurs when multiple entities or processes compete for the same limited resources, leading to contention, delays, or suboptimal outcomes.
  • E. package management system
    A package management system is a tool that automates the processes of finding, installing, upgrading, configuring, and removing software packages and their dependencies in a consistent and reliable way.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd445ff97c81909a2615cc56235470 completed March 20, 2026, 12:58 p.m.
Created at: March 20, 2026, 1:45 p.m.